Finishing the Dome |
02 March | MFG/Ratech has returned to finish up the dome drives and several other items. Work also continues on the earthshine dome. |
03 March | The MFG/Ratech crew is installing the drive chain for the azimuth drive, along with the brackets for the slip rings. |